Building J

From Staples High Wiki

Jump to: navigation, search
Building J location
Building J location
Map of J
Map of J

Building J is the second of three phases of the new three-story structure being built as a part of the Current Construction Project. Looking at the front entrance, it is the south end of the three-story unit. It opened to students on March 1, 2005, nearly two months after the first phase opened. During this time Construction Doors barred student access from Building I to this building.

It must also be noted that Building J contains the three-story wing's basement, which stores the mechanical equipment for the school.

Uses

Personal tools